question
stringlengths 58
131
| QuestionText
stringlengths 7
54
| context
stringlengths 72
1.68k
| Sector
stringclasses 19
values | Country
stringlengths 4
32
| answers
dict | Document
stringclasses 4
values | Alpha3
stringlengths 3
3
| SubSector
stringlengths 3
91
| split
stringclasses 3
values | Question_Definition
stringlengths 10
78
| id
stringlengths 1
5
|
---|---|---|---|---|---|---|---|---|---|---|---|
What is the conditional part of mitigation target provided for the Waste Sector ? | Conditional part of mitigation target | 2030. h) Finalize the technical studies with the intention to construct and operationalize a waste to energy (WTE) plant. 2025. 2015. Conditional. 3. Transport. a) Change fiscal policies on fossil fuel by 2025 to enable the transition to 100% renewable energy generation in the transportation sector. 2025. 2021. Conditional. | Waste | Antigua and Barbuda | {
"answer_start": [
6
],
"text": [
"technical studies with the intention to construct and operationalize a waste to energy (wte) plant"
]
} | Revised First NDC | ATG | Waste-to-Energy | train | Conditional part of mitigation target for a given sectoral plan | 400 |
What adaptation/mitigation/net-zero targets/objectives are provided for the Transport Sector ? | Sectoral targets on | 2030. h) Finalize the technical studies with the intention to construct and operationalize a waste to energy (WTE) plant. 2025. 2015. Conditional. 3. Transport. a) Change fiscal policies on fossil fuel by 2025 to enable the transition to 100% renewable energy generation in the transportation sector. 2025. 2021. Conditional. | Transport | Antigua and Barbuda | {
"answer_start": [
18,
32
],
"text": [
"energy (wte) plant. 2025",
"transport. a) change fiscal policies on fossil fuel by 2025 to enable the transition to 100% renewable energy generation in the transportation sector. 2025"
]
} | Revised First NDC | ATG | Transportation Fuels | train | Targets at the sectoral level | 401 |
What is the conditional part of mitigation target provided for targets/objectives in the Transport Sector ? | Conditional part of mitigation target | 2030. h) Finalize the technical studies with the intention to construct and operationalize a waste to energy (WTE) plant. 2025. 2015. Conditional. 3. Transport. a) Change fiscal policies on fossil fuel by 2025 to enable the transition to 100% renewable energy generation in the transportation sector. 2025. 2021. Conditional. | Transport | Antigua and Barbuda | {
"answer_start": [
18,
32
],
"text": [
"energy (wte) plant. 2025",
"transport. a) change fiscal policies on fossil fuel by 2025 to enable the transition to 100% renewable energy generation in the transportation sector. 2025"
]
} | Revised First NDC | ATG | Transportation Fuels | val | Conditional part of the mitigation target for a given sectoral target | 402 |
What upstream policies and strategies are mentioned in Transport Sector ? | Upstream policies on | a) Change fiscal policies on fossil fuel by 2025 to enable the transition to 100% renewable energy generation in the transportation sector. 2025. 2021. Conditional. b) Ban on the importation of new internal combustion engine vehicles (with an indicative start year of 2025). | Transport | Antigua and Barbuda | {
"answer_start": [
3,
36
],
"text": [
"fiscal policies on fossil fuel by 2025 to enable the transition to 100% renewable energy generation in the transportation sector. 2025",
"importation of new internal combustion engine vehicles (with an indicative start year of 2025"
]
} | Revised First NDC | ATG | Transportation Fuels | train | Information on upstream policies for a given sector | 403 |
What is the conditional part of mitigation target provided for upstream plans and strategies in the Transport Sector ? | Conditional part of mitigation target | a) Change fiscal policies on fossil fuel by 2025 to enable the transition to 100% renewable energy generation in the transportation sector. 2025. 2021. Conditional. b) Ban on the importation of new internal combustion engine vehicles (with an indicative start year of 2025). | Transport | Antigua and Barbuda | {
"answer_start": [
3,
36
],
"text": [
"fiscal policies on fossil fuel by 2025 to enable the transition to 100% renewable energy generation in the transportation sector. 2025",
"importation of new internal combustion engine vehicles (with an indicative start year of 2025"
]
} | Revised First NDC | ATG | Transportation Fuels | train | Conditional part of mitigation target for a given sectoral upstream policy | 404 |
What adaptation/mitigation/net-zero targets/objectives are provided for the Transport Sector ? | Sectoral targets on | 2030. h) Finalize the technical studies with the intention to construct and operationalize a waste to energy (WTE) plant. 2025. 2015. Conditional. 3. Transport. a) Change fiscal policies on fossil fuel by 2025 to enable the transition to 100% renewable energy generation in the transportation sector. 2025. 2021. Conditional. | Transport | Antigua and Barbuda | {
"answer_start": [
18,
32
],
"text": [
"energy (wte) plant. 2025",
"transport. a) change fiscal policies on fossil fuel by 2025 to enable the transition to 100% renewable energy generation in the transportation sector. 2025"
]
} | Revised First NDC | ATG | Transportation Planning | train | Targets at the sectoral level | 405 |
What is the conditional part of mitigation target provided for targets/objectives in the Transport Sector ? | Conditional part of mitigation target | 2030. h) Finalize the technical studies with the intention to construct and operationalize a waste to energy (WTE) plant. 2025. 2015. Conditional. 3. Transport. a) Change fiscal policies on fossil fuel by 2025 to enable the transition to 100% renewable energy generation in the transportation sector. 2025. 2021. Conditional. | Transport | Antigua and Barbuda | {
"answer_start": [
18,
32
],
"text": [
"energy (wte) plant. 2025",
"transport. a) change fiscal policies on fossil fuel by 2025 to enable the transition to 100% renewable energy generation in the transportation sector. 2025"
]
} | Revised First NDC | ATG | Transportation Planning | test | Conditional part of the mitigation target for a given sectoral target | 406 |
What upstream policies and strategies are mentioned in Transport Sector ? | Upstream policies on | 2030. h) Finalize the technical studies with the intention to construct and operationalize a waste to energy (WTE) plant. 2025. 2015. Conditional. 3. Transport. a) Change fiscal policies on fossil fuel by 2025 to enable the transition to 100% renewable energy generation in the transportation sector. 2025. 2021. Conditional. | Transport | Antigua and Barbuda | {
"answer_start": [
18,
32
],
"text": [
"energy (wte) plant. 2025",
"transport. a) change fiscal policies on fossil fuel by 2025 to enable the transition to 100% renewable energy generation in the transportation sector. 2025"
]
} | Revised First NDC | ATG | Transportation Planning | test | Information on upstream policies for a given sector | 407 |
What is the conditional part of mitigation target provided for upstream plans and strategies in the Transport Sector ? | Conditional part of mitigation target | 2030. h) Finalize the technical studies with the intention to construct and operationalize a waste to energy (WTE) plant. 2025. 2015. Conditional. 3. Transport. a) Change fiscal policies on fossil fuel by 2025 to enable the transition to 100% renewable energy generation in the transportation sector. 2025. 2021. Conditional. | Transport | Antigua and Barbuda | {
"answer_start": [
18,
32
],
"text": [
"energy (wte) plant. 2025",
"transport. a) change fiscal policies on fossil fuel by 2025 to enable the transition to 100% renewable energy generation in the transportation sector. 2025"
]
} | Revised First NDC | ATG | Transportation Planning | train | Conditional part of mitigation target for a given sectoral upstream policy | 408 |
What plans and strategies are mentioned pertaining to Waste Sector ? | Sectoral plans on | 2030. c) 100% of government vehicles will be electric vehicles. 2035. d) Establish efficiency standards for the importation of all vehicles. 2020. 2015. Conditional. 4. Waste. a) Circular economy policy and regulations agreed on. 2025. 2021. Conditional. 5. Agriculture, Forestry and Other Land Use. | Waste | Antigua and Barbuda | {
"answer_start": [
8,
36
],
"text": [
"vehicles will be electric vehicles",
"waste. a) circular economy policy and regulations agreed"
]
} | Revised First NDC | ATG | Recycling, Reuse, Reduce | test | Information on sectoral plans | 409 |
What is the conditional part of mitigation target provided for the Waste Sector ? | Conditional part of mitigation target | Table 5: Other Priority Projects in Development. #. Project Title. Description. Donor Agency. 1. Building a Circular Economy and Reducing Emissions in the Waste Sector. The objective of this project is to initiate a transition to circular economy by working with waste industry stakeholders to repurpose waste as a valuable resource, and as a result drive emission out of the sector. | Waste | Antigua and Barbuda | {
"answer_start": [
24,
45
],
"text": [
"economy and reducing emissions in the waste",
"economy by working with waste industry stakeholders to repurpose waste"
]
} | Revised First NDC | ATG | Recycling, Reuse, Reduce | train | Conditional part of mitigation target for a given sectoral plan | 410 |
What plans and strategies are mentioned pertaining to LULUCF/Forestry Sector ? | Sectoral plans on | 4. Waste. a) Circular economy policy and regulations agreed on. 2025. 2021. Conditional. 5. Agriculture, Forestry and Other Land Use. a) All remaining wetlands, watershed areas, and seagrass bed areas with carbon sequestration potential are protected as carbon sinks. 2030. 2015. (Updated in 2021). Conditional. Adaptation2. 6. | LULUCF/Forestry | Antigua and Barbuda | {
"answer_start": [
33
],
"text": [
"remaining wetlands, watershed areas, and seagrass bed areas with carbon sequestration potential are protected as carbon sinks"
]
} | Revised First NDC | ATG | Conservation | val | Information on sectoral plans | 411 |
What is the conditional part of mitigation target provided for the LULUCF/Forestry Sector ? | Conditional part of mitigation target | 4. Waste. a) Circular economy policy and regulations agreed on. 2025. 2021. Conditional. 5. Agriculture, Forestry and Other Land Use. a) All remaining wetlands, watershed areas, and seagrass bed areas with carbon sequestration potential are protected as carbon sinks. 2030. 2015. (Updated in 2021). Conditional. Adaptation2. 6. | LULUCF/Forestry | Antigua and Barbuda | {
"answer_start": [
33
],
"text": [
"remaining wetlands, watershed areas, and seagrass bed areas with carbon sequestration potential are protected as carbon sinks"
]
} | Revised First NDC | ATG | Conservation | train | Conditional part of mitigation target for a given sectoral plan | 412 |
What plans and strategies are mentioned pertaining to LULUCF/Forestry Sector ? | Sectoral plans on | 4. Waste. a) Circular economy policy and regulations agreed on. 2025. 2021. Conditional. 5. Agriculture, Forestry and Other Land Use. a) All remaining wetlands, watershed areas, and seagrass bed areas with carbon sequestration potential are protected as carbon sinks. 2030. 2015. (Updated in 2021). Conditional. Adaptation2. 6. | LULUCF/Forestry | Antigua and Barbuda | {
"answer_start": [
33
],
"text": [
"remaining wetlands, watershed areas, and seagrass bed areas with carbon sequestration potential are protected as carbon sinks"
]
} | Revised First NDC | ATG | Wetlands | test | Information on sectoral plans | 413 |
What is the conditional part of mitigation target provided for the LULUCF/Forestry Sector ? | Conditional part of mitigation target | 4. Waste. a) Circular economy policy and regulations agreed on. 2025. 2021. Conditional. 5. Agriculture, Forestry and Other Land Use. a) All remaining wetlands, watershed areas, and seagrass bed areas with carbon sequestration potential are protected as carbon sinks. 2030. 2015. (Updated in 2021). Conditional. Adaptation2. 6. | LULUCF/Forestry | Antigua and Barbuda | {
"answer_start": [
33
],
"text": [
"remaining wetlands, watershed areas, and seagrass bed areas with carbon sequestration potential are protected as carbon sinks"
]
} | Revised First NDC | ATG | Wetlands | test | Conditional part of mitigation target for a given sectoral plan | 414 |
What conditional actions are mentioned pertaining to Agriculture Sector ? | Sectoral Conditional Actions | 4,000,000. 10. Diversify crops to less climate sensitive cultures. Agriculture and food security. 3,000,000. 11. Technology needs assessment. 500.000. 12. Locally available adapted seed varieties. Agriculture and food security. 5,000,000. 13. Climate monitoring and data management system. Early warning system and disaster risk management. 17,500,000. 14. | Agriculture | Angola | {
"answer_start": [
4,
29
],
"text": [
"diversify crops to less climate sensitive cultures. agriculture",
"locally available adapted seed varieties. agriculture"
]
} | INDC | AGO | Crops | test | Condition actions of the sectoral level | 415 |
What Unconditional Actions are mentioned pertaining to Agriculture Sector ? | Sectoral Unconditional Actions | Implementing GEF agency: FAO. Enhancing climate change resilience in the Benguela current fisheries system (regional project: Angola, Namibia and South Africa). The project aims to build resilience and reduce vulnerability of the Benguela Current marine fisheries systems to climate change through strengthened adaptive capacity and implementation of participatory and integrated adaptive strategies in order to ensure food and livelihood security. | Agriculture | Angola | {
"answer_start": [
6,
39
],
"text": [
"enhancing climate change resilience in the benguela current fisheries system (regional project: angola, namibia and south africa). the project aims to build resilience",
"benguela current marine fisheries systems to climate change"
]
} | INDC | AGO | Fisheries and aquaculture | train | Unconditional sectoral actions | 416 |
What conditional actions are mentioned pertaining to Agriculture Sector ? | Sectoral Conditional Actions | Increase water availability through village-level wells and boreholes. Water resources. Water availability and distribution. 5,000,000. 16. Implement water resources integrated management. Water resources. Water management. 3,000,000. 17. Map areas of erosion risk. Terrestrial ecosystems. 1,000,000. 18. Implement water-harvesting system in drought-prone areas. Agriculture and food security. Water resources. 3,000,000. 19. | Agriculture | Angola | {
"answer_start": [
11,
29,
52
],
"text": [
"water resources. water",
"water resources. water",
"implement water-harvesting system in drought-prone areas. agriculture and food security. water"
]
} | INDC | AGO | Food security | train | Condition actions of the sectoral level | 417 |
What Unconditional Actions are mentioned pertaining to Agriculture Sector ? | Sectoral Unconditional Actions | Integrating Climate Resilience into Agricultural and Agropastoral Production Systems through Soil Fertility Management in Key Productive and Vulnerable Areas Using the Farmers Field School Approach. The project aims to strengthen the climate resilience of the agropastoral production systems in the key vulnerable areas of Angola of the Central Plateau (Bie, Huambo and Malanje). | Agriculture | Angola | {
"answer_start": [
0,
32
],
"text": [
"integrating climate resilience into agricultural and agropastoral production systems through soil fertility management in key productive and vulnerable areas using the farmers field school approach",
"climate resilience of the agropastoral production systems in the key vulnerable areas"
]
} | INDC | AGO | Food security | test | Unconditional sectoral actions | 418 |
Which agency is responsible for implementing the unconditional actions in the Agriculture Sector ? | Implementing Agency for Sectoral Unconditional Actions | The project will disseminate sustainable land management and adaptation practices in agro-forestry and land ecology in 350 communities. Agriculture and food security. Total project cost (US $ million): 24.831. Implementing GEF agency: AfDB. Addressing urgent coastal adaptation needs and capacity gaps in Angola. | Agriculture | Angola | {
"answer_start": [
21
],
"text": [
"agriculture and food security"
]
} | INDC | AGO | Food security | train | The agency responsible for implementing the sectoral unconditional actions | 419 |
What adaptation targets/objectives are provided for the Agriculture Sector ? | Sectoral Target | Total project cost (US $ million): 37.179. Implementing GEF agency: UNDP. Integrating climate change into environment and sustainable land management practices. The project will disseminate sustainable land management and adaptation practices in agro-forestry and land ecology in 350 communities. Agriculture and food security. Total project cost (US $ million): 24.831. | Agriculture | Angola | {
"answer_start": [
22,
30
],
"text": [
"sustainable land management practices",
"disseminate sustainable land management and adaptation practices in agro-forestry and land ecology in 350 communities. agriculture"
]
} | INDC | AGO | Land and soil management | train | Adaptation targets/ objectives at the sectoral level | 420 |
What Unconditional Actions are mentioned pertaining to Agriculture Sector ? | Sectoral Unconditional Actions | The unconditional actions (current) are listed below and its implementation costs amounts to around 500 million USD at current price. Project Title. Description. Sector. Land Rehabilitation and Rangelands Management in Small Holders Agropastoral Production Systems in Soutwestern Angola (Project RETESA). | Agriculture | Angola | {
"answer_start": [
30
],
"text": [
"land rehabilitation and rangelands management in small holders agropastoral production systems in soutwestern angola (project retesa"
]
} | INDC | AGO | Land and soil management | train | Unconditional sectoral actions | 421 |
What conditional actions are mentioned pertaining to Coastal Zone Sector ? | Sectoral Conditional Actions | Study the vulnerability of the fisheries sector to climate change and current modifications*. Coastal zones/Marine ecosystems. Fisheries, Agriculture and food security. 2,000,000. 5. Extend electricity grid to rural areas*. Energy. Electricity provision. 5,000,000. 6. Revise sectoral laws for proactive adaptation. 2,000,000. 7. | Coastal Zone | Angola | {
"answer_start": [
0
],
"text": [
"study the vulnerability of the fisheries sector to climate change and current modifications*. coastal zones"
]
} | INDC | AGO | Coastal fisheries | train | Condition actions of the sectoral level | 422 |
What conditional actions are mentioned pertaining to Coastal Zone Sector ? | Sectoral Conditional Actions | Study impacts of sedimentation and siltation rates on coastal processes. Coastal zones/marine ecosystems. 3,500,000. 25. Improve design and construction of buildings. Infrastructure. 1,000,000. 26. Study impact of climate change on hydroelectricity. Water resources. Energy. 1,000,000. 27. Revise building codes to promote retreat from flood plains and coastal zones. 1,000,000. 28. | Coastal Zone | Angola | {
"answer_start": [
0,
61
],
"text": [
"study impacts of sedimentation and siltation rates on coastal processes. coastal zones",
"coastal zones"
]
} | INDC | AGO | Coastal management | train | Condition actions of the sectoral level | 423 |
What Unconditional Actions are mentioned pertaining to Coastal Zone Sector ? | Sectoral Unconditional Actions | Total project cost (US $ million): 24.831. Implementing GEF agency: AfDB. Addressing urgent coastal adaptation needs and capacity gaps in Angola. Enhancement of coastal adaptive capacities at the institutional, systemic and community levels; response to urgent needs posed by climate change. Coastal zones/Marine ecosystems. | Coastal Zone | Angola | {
"answer_start": [
16,
50
],
"text": [
"addressing urgent coastal adaptation needs and capacity gaps in angola. enhancement of coastal adaptive capacities",
"coastal zones"
]
} | INDC | AGO | Coastal management | test | Unconditional sectoral actions | 424 |
What conditional actions are mentioned pertaining to Coastal Zone Sector ? | Sectoral Conditional Actions | Study impact of climate change on hydroelectricity. Water resources. Energy. 1,000,000. 27. Revise building codes to promote retreat from flood plains and coastal zones. 1,000,000. 28. Construct sea level protection structure. Infrastructure. Coastal zones and marine ecosystems. 10,000,000. 29. Study impact of climate change on mining. Energy. 500.000. **Total. 107,500,000. | Coastal Zone | Angola | {
"answer_start": [
19,
34,
42
],
"text": [
"codes to promote retreat from flood plains and coastal zones",
"construct sea level protection",
"coastal zones"
]
} | INDC | AGO | Sea-level rise protection | train | Condition actions of the sectoral level | 425 |
What conditional actions are mentioned pertaining to Disaster Risk Management (DRM) Sector ? | Sectoral Conditional Actions | Monitor groundwater. Water resources. 3,000,000. 23. Construct flood protection barriers along major rivers. Water resources. Disaster risk management. 5,000,000. 24. Study impacts of sedimentation and siltation rates on coastal processes. Coastal zones/marine ecosystems. 3,500,000. 25. Improve design and construction of buildings. Infrastructure. 1,000,000. 26. | Disaster Risk Management (DRM) | Angola | {
"answer_start": [
10,
21
],
"text": [
"construct flood protection barriers along major rivers",
"disaster risk management"
]
} | INDC | AGO | Disaster preparedness | train | Condition actions of the sectoral level | 426 |
What Unconditional Actions are mentioned pertaining to Disaster Risk Management (DRM) Sector ? | Sectoral Unconditional Actions | Disaster risk reduction/ management to support agropastoral communities affected by recurrent droughts and other natural disasters in southern Angola and northern Namibia (Project PIRAN). The objective is to strengthen food security and DRR/M, and increase the resilience of agro-pastoral livelihoods by increasing capacity to manage risks related to natural disasters at the level of communities and local institutions. | Disaster Risk Management (DRM) | Angola | {
"answer_start": [
0,
53
],
"text": [
"disaster risk reduction/ management to support agropastoral communities affected by recurrent droughts and other natural disasters in southern angola and northern namibia (project piran",
"risks related to natural disasters"
]
} | INDC | AGO | Disaster relief and recovery | train | Unconditional sectoral actions | 427 |
Who is funding for the unconditional actions in the Disaster Risk Management (DRM) Sector ? | Funders for Sectoral Unconditional Actions | Disaster risk management. Agriculture and food security. Total project cost (US $ million): 1.600 (1.180 for Angola) for the first year. Implementing GEF agency: FAO Donor: United States of America (USAID/OFDA). | Disaster Risk Management (DRM) | Angola | {
"answer_start": [
0,
40
],
"text": [
"disaster risk management",
"usaid/ofda"
]
} | INDC | AGO | Disaster relief and recovery | train | The funders for sectoral unconditional actions | 428 |
What conditional actions are mentioned pertaining to Disaster Risk Management (DRM) Sector ? | Sectoral Conditional Actions | 5. Extend electricity grid to rural areas*. Energy. Electricity provision. 5,000,000. 6. Revise sectoral laws for proactive adaptation. 2,000,000. 7. Create an early warning system for flooding and storms. Early warning system and disaster risk management. Early warning system. 3,500,000. 8. National institutional mechanism for adaptation planning and mainstreaming. 2,000,000. | Disaster Risk Management (DRM) | Angola | {
"answer_start": [
30
],
"text": [
"create an early warning system for flooding and storms. early warning system and disaster risk management. early warning system"
]
} | INDC | AGO | Early warning system | train | Condition actions of the sectoral level | 429 |
What Unconditional Actions are mentioned pertaining to Disaster Risk Management (DRM) Sector ? | Sectoral Unconditional Actions | Implementing GEF agency: FAO. Promoting climate- resilient development and enhanced adaptive capacity to withstand disaster risks in Angola’s Cuvelai River Basin. The project is focused on strengthening the capacity of national and sub-national entities to monitor climate change, generate reliable hydro-meteorological information (including forecasts) and to be able to combine this information with other environmental and socio-economic data to improve evidence- based decision-making for early warning and adaptation responses as well as planning. | Disaster Risk Management (DRM) | Angola | {
"answer_start": [
6
],
"text": [
"promoting climate- resilient development and enhanced adaptive capacity to withstand disaster risks in angola’s cuvelai river basin"
]
} | INDC | AGO | Early warning system | train | Unconditional sectoral actions | 430 |
What Unconditional Actions are mentioned pertaining to Energy Sector ? | Sectoral Unconditional Actions | Total project cost (US $ million): 32.143. Implementing GEF agency: FAO. Promotion of Sustainable Charcoal in Angola through a Value Chain Approach. To reduce the current unsustainable and GHG-intensive biomass production and utilization from Angola's Miombo woodlands via an integrated suite of interventions in the country's charcoal value chain. | Energy | Angola | {
"answer_start": [
16,
56
],
"text": [
"promotion of sustainable charcoal in angola through a value chain approach",
"charcoal value chain"
]
} | INDC | AGO | Biomass energy | train | Unconditional sectoral actions | 431 |
What conditional actions are mentioned pertaining to Energy Sector ? | Sectoral Conditional Actions | Study impact of climate change on hydroelectricity. Water resources. Energy. 1,000,000. 27. Revise building codes to promote retreat from flood plains and coastal zones. 1,000,000. 28. Construct sea level protection structure. Infrastructure. Coastal zones and marine ecosystems. 10,000,000. 29. Study impact of climate change on mining. Energy. 500.000. **Total. 107,500,000. | Energy | Angola | {
"answer_start": [
0,
52
],
"text": [
"study impact of climate change",
"study impact of climate change on mining. energy"
]
} | INDC | AGO | Energy: General | val | Condition actions of the sectoral level | 432 |
What adaptation targets/objectives are provided for the Energy Sector ? | Sectoral Target | Construction of hydroelectric and thermal power plants (CaculoCabaça, Soyo …) that will generate about five thousand megawatts, during the period 2013/2017. Energy. Implementing Angolan Ministry: Ministry of Energy and Water. National Directorate of Renewable Energy. Energy and Water Sector Action Plan 2013-2017. | Energy | Angola | {
"answer_start": [
15,
42,
49
],
"text": [
"generate about five thousand megawatts",
"energy. energy",
"plan 2013-2017"
]
} | INDC | AGO | Power system planning | val | Adaptation targets/ objectives at the sectoral level | 433 |
What Unconditional Actions are mentioned pertaining to Energy Sector ? | Sectoral Unconditional Actions | Total project cost (US $ million): 150 (to 2025). Implementing Angolan Ministry: Ministry of Energy and Water. National Directorate of Renewable Energy. Construction of hydroelectric and thermal power plants. Construction of hydroelectric and thermal power plants (CaculoCabaça, Soyo …) that will generate about five thousand megawatts, during the period 2013/2017. | Energy | Angola | {
"answer_start": [
28
],
"text": [
"energy. construction of hydroelectric and thermal power plants. construction of hydroelectric and thermal power plants"
]
} | INDC | AGO | Power system planning | train | Unconditional sectoral actions | 434 |
Which agency is responsible for implementing the unconditional actions in the Energy Sector ? | Implementing Agency for Sectoral Unconditional Actions | Implementing Angolan Ministry: Ministry of Energy and Water. National Directorate of Renewable Energy. Energy and Water Sector Action Plan 2013-2017. A characterisation of the two sub-sectors, including infrastructure and the institutional component, which result in commonalities, e.g. | Energy | Angola | {
"answer_start": [
2
],
"text": [
"ministry: ministry of energy and water. national directorate of renewable energy. energy and water sector action plan"
]
} | INDC | AGO | Power system planning | train | The agency responsible for implementing the sectoral unconditional actions | 435 |
What conditional actions are mentioned pertaining to Energy Sector ? | Sectoral Conditional Actions | Study impact of climate change on hydroelectricity. Water resources. Energy. 1,000,000. 27. Revise building codes to promote retreat from flood plains and coastal zones. 1,000,000. 28. Construct sea level protection structure. Infrastructure. Coastal zones and marine ecosystems. 10,000,000. 29. Study impact of climate change on mining. Energy. 500.000. **Total. 107,500,000. | Energy | Angola | {
"answer_start": [
0,
52
],
"text": [
"study impact of climate change on hydroelectricity",
"study impact of climate change on mining. energy"
]
} | INDC | AGO | Renewable Energy: Hydro | train | Condition actions of the sectoral level | 436 |
What adaptation targets/objectives are provided for the Energy Sector ? | Sectoral Target | The goal of the Executive is to produce by 2025 about 100 megawatts of solar power to all rural areas, an investment estimated at $ 150 million. Renewable energy. Total project cost (US $ million): 150 (to 2025). Implementing Angolan Ministry: Ministry of Energy and Water. National Directorate of Renewable Energy. | Energy | Angola | {
"answer_start": [
7,
59
],
"text": [
"produce by 2025 about 100 megawatts of solar power to all rural areas",
"renewable energy"
]
} | INDC | AGO | Renewable Energy: Solar | val | Adaptation targets/ objectives at the sectoral level | 437 |
What Unconditional Actions are mentioned pertaining to Energy Sector ? | Sectoral Unconditional Actions | To reduce the current unsustainable and GHG-intensive biomass production and utilization from Angola's Miombo woodlands via an integrated suite of interventions in the country's charcoal value chain. Renewable energy. Forestry. Total project cost (US $ million): 17.884. Implementing GEF agency: UNDP. The “Solar Village” Programme. The “Solar Village” Programme, launched by the Executive under the National Development Plan (PND) 2013-2017, allowed to date the electrification of 48 villages in different regions of the country, benefiting 100,000 families. | Energy | Angola | {
"answer_start": [
55
],
"text": [
"solar village” programme. the “solar village” programme"
]
} | INDC | AGO | Renewable Energy: Solar | train | Unconditional sectoral actions | 438 |
Which agency is responsible for implementing the unconditional actions in the Energy Sector ? | Implementing Agency for Sectoral Unconditional Actions | The power sector:As part of the projectMapping of the Winds and Solar of Angola (Implementing Angolan Ministry: Ministry of Energy and Water. National Directorate of Renewable Energy), which aimed at identifying the most suitable sites for the development of endogenous energy resources,a potential of 8,491MW of renewable sources were identified:. | Energy | Angola | {
"answer_start": [
19
],
"text": [
"ministry: ministry of energy and water. national directorate of renewable energy"
]
} | INDC | AGO | Renewable Energy: Solar | train | The agency responsible for implementing the sectoral unconditional actions | 439 |
What conditional actions are mentioned pertaining to Health Sector ? | Sectoral Conditional Actions | Agriculture and food security. 5,000,000. 13. Climate monitoring and data management system. Early warning system and disaster risk management. 17,500,000. 14. Study the implication of climate change on disease patterns for humans and livestock. Agriculture and food security. Health. 1,500,000. 15. Increase water availability through village-level wells and boreholes. | Health | Angola | {
"answer_start": [
28
],
"text": [
"study the implication of climate change on disease patterns for humans and livestock"
]
} | INDC | AGO | Disease surveillance and control | test | Condition actions of the sectoral level | 440 |
What conditional actions are mentioned pertaining to Health Sector ? | Sectoral Conditional Actions | Agriculture and food security. Land rehabilitation, Agriculture. 5,000,000. 3. Ensure basic access to health services and health monitoring*. Health. Health. 3,000,000. 4. Study the vulnerability of the fisheries sector to climate change and current modifications*. Coastal zones/Marine ecosystems. Fisheries, Agriculture and food security. 2,000,000. 5. | Health | Angola | {
"answer_start": [
14
],
"text": [
"ensure basic access to health services and health monitoring*. health. health"
]
} | INDC | AGO | Health services and assessment | train | Condition actions of the sectoral level | 441 |
What conditional actions are mentioned pertaining to LULUCF/Forestry Sector ? | Sectoral Conditional Actions | The estimated cost of implementing the NAPA priority projects amounts to over 500 million USD if current inflation rates are applied to 2011 costing. PROJECT TITLE. PROJECT SECTOR. SECTOR COMPONENT(S). PROJECT COST (USD). 1. Promote alternative renewable energies to avoid deforestation*. Energy. Renewable energy, Forestry. 3,500,000*. 2. | LULUCF/Forestry | Angola | {
"answer_start": [
44
],
"text": [
"alternative renewable energies to avoid deforestation*. energy. renewable energy, forestry"
]
} | INDC | AGO | Land degradation | train | Condition actions of the sectoral level | 442 |
What conditional actions are mentioned pertaining to Urban Sector ? | Sectoral Conditional Actions | Monitor groundwater. Water resources. 3,000,000. 23. Construct flood protection barriers along major rivers. Water resources. Disaster risk management. 5,000,000. 24. Study impacts of sedimentation and siltation rates on coastal processes. Coastal zones/marine ecosystems. 3,500,000. 25. Improve design and construction of buildings. Infrastructure. 1,000,000. 26. | Urban | Angola | {
"answer_start": [
50
],
"text": [
"improve design and construction"
]
} | INDC | AGO | Buildings: General | train | Condition actions of the sectoral level | 443 |
What conditional actions are mentioned pertaining to Water Sector ? | Sectoral Conditional Actions | Study the implication of climate change on disease patterns for humans and livestock. Agriculture and food security. Health. 1,500,000. 15. Increase water availability through village-level wells and boreholes. Water resources. Water availability and distribution. 5,000,000. 16. Implement water resources integrated management. Water resources. Water management. 3,000,000. 17. | Water | Angola | {
"answer_start": [
25,
49
],
"text": [
"increase water availability through village-level wells and boreholes. water resources. water availability",
"water resources integrated management. water resources. water management"
]
} | INDC | AGO | Water management | train | Condition actions of the sectoral level | 444 |
What conditional actions are mentioned pertaining to Water Sector ? | Sectoral Conditional Actions | Map areas of erosion risk. Terrestrial ecosystems. 1,000,000. 18. Implement water-harvesting system in drought-prone areas. Agriculture and food security. Water resources. 3,000,000. 19. Improve knowledge of hydrology. Water resources. 2,000,000. 20. Extend water and sanitation network to rural areas. Water resources. Infrastructure. 10,000,000. 21. Explore industrial opportunities from climate change. | Water | Angola | {
"answer_start": [
48
],
"text": [
"extend water and sanitation network to rural areas. water"
]
} | INDC | AGO | Water supply | train | Condition actions of the sectoral level | 445 |
What is the conditional part of mitigation target provided for the Agriculture Sector ? | Conditional part of mitigation target | Many of the actions envisaged in these plans and strategies, particularly in the energy sector, are linked to both adaptation and mitigation. Objectives and Sectoral Intervention for Adaptation. Within the context of this INDC, Angola prioritises the implementation of Adaptation measures in the following main sectors:. Agriculture. Coastal Zone. | Agriculture | Angola | {
"answer_start": [
50
],
"text": [
"sectors:. agriculture"
]
} | INDC | AGO | Agriculture: General | train | Conditional part of mitigation target for a given sectoral plan | 446 |
What is the conditional part of mitigation target provided for downstream actions in the Energy Sector ? | Conditional part of mitigation target | 681 MW for wind energy projects,. 438 MW for solar projects,. 640 MW for biomass projects, and. 6,732 MW hydroelectric projects. With an investment of 11,346 million USD. | Energy | Angola | {
"answer_start": [
1
],
"text": [
"mw for wind energy projects,. 438 mw for solar projects,. 640 mw for biomass projects, and. 6,732 mw hydroelectric projects"
]
} | INDC | AGO | Renewable Energy | train | Conditional part of mitigation target for a given sectoral downstream actions | 447 |
What are the downstream actions that are incorporated in the Energy Sector as part of Nationally Determined Contributions? | Downstream actions | 681 MW for wind energy projects,. 438 MW for solar projects,. 640 MW for biomass projects, and. 6,732 MW hydroelectric projects. With an investment of 11,346 million USD. | Energy | Angola | {
"answer_start": [
1
],
"text": [
"mw for wind energy projects,. 438 mw for solar projects,. 640 mw for biomass projects, and. 6,732 mw hydroelectric projects"
]
} | INDC | AGO | Renewable Energy | val | Sectoral downstream actions to be undertaken as part of the NDC contribution | 448 |
What is the conditional part of mitigation target provided for downstream actions in the Energy Sector ? | Conditional part of mitigation target | 681 MW for wind energy projects,. 438 MW for solar projects,. 640 MW for biomass projects, and. 6,732 MW hydroelectric projects. With an investment of 11,346 million USD. | Energy | Angola | {
"answer_start": [
1,
24
],
"text": [
"mw for wind energy projects,. 438 mw for solar projects,. 640 mw for biomass projects",
"mw hydroelectric projects"
]
} | INDC | AGO | Renewable Energy: Biofuels | train | Conditional part of mitigation target for a given sectoral downstream actions | 449 |
What are the downstream actions that are incorporated in the Energy Sector as part of Nationally Determined Contributions? | Downstream actions | 681 MW for wind energy projects,. 438 MW for solar projects,. 640 MW for biomass projects, and. 6,732 MW hydroelectric projects. With an investment of 11,346 million USD. | Energy | Angola | {
"answer_start": [
1,
24
],
"text": [
"mw for wind energy projects,. 438 mw for solar projects,. 640 mw for biomass projects",
"mw hydroelectric projects"
]
} | INDC | AGO | Renewable Energy: Biofuels | train | Sectoral downstream actions to be undertaken as part of the NDC contribution | 450 |
What is the conditional part of mitigation target provided for downstream actions in the Energy Sector ? | Conditional part of mitigation target | 681 MW for wind energy projects,. 438 MW for solar projects,. 640 MW for biomass projects, and. 6,732 MW hydroelectric projects. With an investment of 11,346 million USD. | Energy | Angola | {
"answer_start": [
1
],
"text": [
"mw for wind energy projects,. 438 mw for solar projects,. 640 mw for biomass projects, and. 6,732 mw hydroelectric projects"
]
} | INDC | AGO | Renewable Energy: Hydro | train | Conditional part of mitigation target for a given sectoral downstream actions | 451 |
What are the downstream actions that are incorporated in the Energy Sector as part of Nationally Determined Contributions? | Downstream actions | Cambambe Hydroelectric Second Power Plant:The Cambambe project activity is located on the Municipality of Cambambe, 180 km east of Luanda, the National Capital. The proposed project comprises a capacity addition to the existing Cambambe Hydroelectric Power Plant with installation of additional 700 MW of the actual generation capacity. | Energy | Angola | {
"answer_start": [
0,
38
],
"text": [
"cambambe hydroelectric second power plant:the cambambe project",
"cambambe hydroelectric power plant"
]
} | INDC | AGO | Renewable Energy: Hydro | train | Sectoral downstream actions to be undertaken as part of the NDC contribution | 452 |
What is the unconditional part of mitigation target provided for downstream actions in the Energy Sector ? | Unconditional part of mitigation target | Cambambe Hydroelectric Second Power Plant:The Cambambe project activity is located on the Municipality of Cambambe, 180 km east of Luanda, the National Capital. The proposed project comprises a capacity addition to the existing Cambambe Hydroelectric Power Plant with installation of additional 700 MW of the actual generation capacity. | Energy | Angola | {
"answer_start": [
0,
38
],
"text": [
"cambambe hydroelectric second power plant:the cambambe",
"cambambe hydroelectric power plant"
]
} | INDC | AGO | Renewable Energy: Hydro | train | Unconditional part of mitigation target for a given sectoral downstream action | 453 |
What is the conditional part of mitigation target provided for downstream actions in the Energy Sector ? | Conditional part of mitigation target | 681 MW for wind energy projects,. 438 MW for solar projects,. 640 MW for biomass projects, and. 6,732 MW hydroelectric projects. With an investment of 11,346 million USD. | Energy | Angola | {
"answer_start": [
1,
24
],
"text": [
"mw for wind energy projects,. 438 mw for solar projects,. 640 mw for biomass projects",
"mw hydroelectric projects"
]
} | INDC | AGO | Renewable Energy: Solar | val | Conditional part of mitigation target for a given sectoral downstream actions | 454 |
What are the downstream actions that are incorporated in the Energy Sector as part of Nationally Determined Contributions? | Downstream actions | 681 MW for wind energy projects,. 438 MW for solar projects,. 640 MW for biomass projects, and. 6,732 MW hydroelectric projects. With an investment of 11,346 million USD. | Energy | Angola | {
"answer_start": [
1,
24
],
"text": [
"mw for wind energy projects,. 438 mw for solar projects,. 640 mw for biomass projects",
"mw hydroelectric projects"
]
} | INDC | AGO | Renewable Energy: Solar | train | Sectoral downstream actions to be undertaken as part of the NDC contribution | 455 |
What is the conditional part of mitigation target provided for downstream actions in the Energy Sector ? | Conditional part of mitigation target | 681 MW for wind energy projects,. 438 MW for solar projects,. 640 MW for biomass projects, and. 6,732 MW hydroelectric projects. With an investment of 11,346 million USD. | Energy | Angola | {
"answer_start": [
0,
24
],
"text": [
"681 mw for wind energy projects,. 438 mw for solar projects,. 640 mw for biomass projects",
"mw hydroelectric projects"
]
} | INDC | AGO | Renewable Energy: Wind | val | Conditional part of mitigation target for a given sectoral downstream actions | 456 |
What are the downstream actions that are incorporated in the Energy Sector as part of Nationally Determined Contributions? | Downstream actions | 681 MW for wind energy projects,. 438 MW for solar projects,. 640 MW for biomass projects, and. 6,732 MW hydroelectric projects. With an investment of 11,346 million USD. | Energy | Angola | {
"answer_start": [
0,
24
],
"text": [
"681 mw for wind energy projects,. 438 mw for solar projects,. 640 mw for biomass projects",
"mw hydroelectric projects"
]
} | INDC | AGO | Renewable Energy: Wind | train | Sectoral downstream actions to be undertaken as part of the NDC contribution | 457 |
What is the unconditional part of mitigation target provided for downstream actions in the Energy Sector ? | Unconditional part of mitigation target | In the absence of project activity, fossil fuels burned in power plants that are connected to the grid. An ex ante estimative of annual emission reductions is 3,282,000tCO2e per year. Tombwa Wind Farm. The Tombwa project activity is located on the Municipality of Tombwa, Namibe Province, 1,234 km east of Luanda, the National Capital. | Energy | Angola | {
"answer_start": [
33
],
"text": [
"tombwa wind farm. the tombwa"
]
} | INDC | AGO | Renewable Energy: Wind | train | Unconditional part of mitigation target for a given sectoral downstream action | 458 |
What is the unconditional part of mitigation target provided for plans and strategies in the Industries Sector ? | Unconditional part of mitigation target | Strategic Plan of Disaster Risk Management (2011);. National Action Programme to fight Desertification (2014);. and, above all, the Strategy of Long-term Development for Angola (2025). Many of the actions envisaged in these plans and strategies, particularly in the energy sector, are linked to both adaptation and mitigation. | Industries | Angola | {
"answer_start": [
1
],
"text": [
"plan of disaster risk management"
]
} | INDC | AGO | Industries: General | train | Unconditional part of mitigation target for a given sectoral plan | 459 |
What is the conditional part of mitigation target provided for the LULUCF/Forestry Sector ? | Conditional part of mitigation target | The calculation of CO2 emissions and removals from land use changes and forestry is primarily based on the following main activities:- Forestry conversion;- Use of biomass;- Phase-out of harvested land.The sector is thought to have captured close to 3 million tons of CO2e in 2005, and the country is committed to increase carbon sequestration from the forestry sector to 5 million tons of CO2e per year by 2030. Presentation of conditional mitigation options. | LULUCF/Forestry | Angola | {
"answer_start": [
8,
59
],
"text": [
"land use changes and forestry",
"forestry sector"
]
} | INDC | AGO | Afforestation | train | Conditional part of mitigation target for a given sectoral plan | 460 |
What adaptation/mitigation/net-zero targets/objectives are provided for the LULUCF/Forestry Sector ? | Sectoral targets on | The calculation of CO2 emissions and removals from land use changes and forestry is primarily based on the following main activities:- Forestry conversion;- Use of biomass;- Phase-out of harvested land.The sector is thought to have captured close to 3 million tons of CO2e in 2005, and the country is committed to increase carbon sequestration from the forestry sector to 5 million tons of CO2e per year by 2030. Presentation of conditional mitigation options. | LULUCF/Forestry | Angola | {
"answer_start": [
8,
54,
68
],
"text": [
"land use changes and forestry",
"increase carbon sequestration from the forestry sector to 5",
"year by 2030"
]
} | INDC | AGO | LULUCF/Forestry: General | test | Targets at the sectoral level | 461 |
What is the unconditional part of mitigation target/efforts provided for the LULUCF/Forestry Sectoral targets? | Unconditional part of mitigation target | The calculation of CO2 emissions and removals from land use changes and forestry is primarily based on the following main activities:- Forestry conversion;- Use of biomass;- Phase-out of harvested land.The sector is thought to have captured close to 3 million tons of CO2e in 2005, and the country is committed to increase carbon sequestration from the forestry sector to 5 million tons of CO2e per year by 2030. Presentation of conditional mitigation options. | LULUCF/Forestry | Angola | {
"answer_start": [
8,
54,
68
],
"text": [
"land use changes and forestry",
"increase carbon sequestration from the forestry sector to 5",
"year by 2030"
]
} | INDC | AGO | LULUCF/Forestry: General | test | Unconditional part of the mitigation effort for a given sectoral target | 462 |
What is the conditional part of mitigation target provided for the LULUCF/Forestry Sector ? | Conditional part of mitigation target | The calculation of CO2 emissions and removals from land use changes and forestry is primarily based on the following main activities:- Forestry conversion;- Use of biomass;- Phase-out of harvested land.The sector is thought to have captured close to 3 million tons of CO2e in 2005, and the country is committed to increase carbon sequestration from the forestry sector to 5 million tons of CO2e per year by 2030. Presentation of conditional mitigation options. | LULUCF/Forestry | Angola | {
"answer_start": [
8,
59
],
"text": [
"land use changes and forestry",
"forestry sector"
]
} | INDC | AGO | REDD+ | test | Conditional part of mitigation target for a given sectoral plan | 463 |
What is the conditional part of mitigation target provided for the LULUCF/Forestry Sector ? | Conditional part of mitigation target | The calculation of CO2 emissions and removals from land use changes and forestry is primarily based on the following main activities:- Forestry conversion;- Use of biomass;- Phase-out of harvested land.The sector is thought to have captured close to 3 million tons of CO2e in 2005, and the country is committed to increase carbon sequestration from the forestry sector to 5 million tons of CO2e per year by 2030. Presentation of conditional mitigation options. | LULUCF/Forestry | Angola | {
"answer_start": [
8,
59
],
"text": [
"land use changes and forestry",
"forestry sector"
]
} | INDC | AGO | Reforestation | train | Conditional part of mitigation target for a given sectoral plan | 464 |
What is the unconditional part of mitigation target provided for plans and strategies in the LULUCF/Forestry Sector ? | Unconditional part of mitigation target | The calculation of CO2 emissions and removals from land use changes and forestry is primarily based on the following main activities:- Forestry conversion;- Use of biomass;- Phase-out of harvested land.The sector is thought to have captured close to 3 million tons of CO2e in 2005, and the country is committed to increase carbon sequestration from the forestry sector to 5 million tons of CO2e per year by 2030. Presentation of conditional mitigation options. | LULUCF/Forestry | Angola | {
"answer_start": [
8,
59
],
"text": [
"land use changes and forestry",
"forestry sector"
]
} | INDC | AGO | Sustainable Forest Management | test | Unconditional part of mitigation target for a given sectoral plan | 465 |
What is the unconditional part of mitigation target provided for plans and strategies in the LULUCF/Forestry Sector ? | Unconditional part of mitigation target | The calculation of CO2 emissions and removals from land use changes and forestry is primarily based on the following main activities:- Forestry conversion;- Use of biomass;- Phase-out of harvested land.The sector is thought to have captured close to 3 million tons of CO2e in 2005, and the country is committed to increase carbon sequestration from the forestry sector to 5 million tons of CO2e per year by 2030. Presentation of conditional mitigation options. | LULUCF/Forestry | Angola | {
"answer_start": [
8,
59
],
"text": [
"land use changes and forestry",
"forestry sector"
]
} | INDC | AGO | Sustainable Land Management | train | Unconditional part of mitigation target for a given sectoral plan | 466 |
What are the Adaptation action/priority for the Agriculture Sector? | Action and priority | Within the context of this NDC, Angola prioritizes the implementation of adaptation measures in the following main sectors:. Agriculture and Fisheries. Coastal Zone. Forest, Ecosystem and Biodiversity. Water resources. Human Health. Infra-structures. Agriculture and Fisheries. Climate change requires farmers to adapt to new agronomic practices such as conservation agriculture, growing of drought tolerant crops, precision agriculture (which in turn also requires a better access to input for seeds and fertilizers) and agro-forestry amongst others in order to improve productivity. | Agriculture | Angola | {
"answer_start": [
44,
67
],
"text": [
"agriculture and fisheries. climate",
"crops, precision agriculture"
]
} | First NDC | AGO | Crops | train | Adaptation action/priority | 467 |
Which Sector forms part of global climate change adaptation sector ? | Adapt Now sector | The fund is intended to be an instrument to boost agriculture, one of the priority sectors for the diversification of the national economy. The Government intends to develop the sector by promoting the local, regional and national economy and being a driving force for compliance with SDG 2: Eradicate hunger, achieve food security, improve nutrition and promote sustainable agriculture. | Agriculture | Angola | {
"answer_start": [
56
],
"text": [
"food security, improve nutrition and promote sustainable agriculture"
]
} | First NDC | AGO | Crops | train | GCA_Sector | 468 |
Which subsector forms part of global climate change adaptation subsector in Agriculture Sector ? | Adapt Now subsector | The fund is intended to be an instrument to boost agriculture, one of the priority sectors for the diversification of the national economy. The Government intends to develop the sector by promoting the local, regional and national economy and being a driving force for compliance with SDG 2: Eradicate hunger, achieve food security, improve nutrition and promote sustainable agriculture. | Agriculture | Angola | {
"answer_start": [
55
],
"text": [
"achieve food security"
]
} | First NDC | AGO | Crops | train | GCA_subsector | 469 |
Which Sector forms part of global climate change adaptation sector ? | Adapt Now sector | The fund is intended to be an instrument to boost agriculture, one of the priority sectors for the diversification of the national economy. The Government intends to develop the sector by promoting the local, regional and national economy and being a driving force for compliance with SDG 2: Eradicate hunger, achieve food security, improve nutrition and promote sustainable agriculture. | Agriculture | Angola | {
"answer_start": [
56
],
"text": [
"food security, improve nutrition and promote sustainable agriculture"
]
} | First NDC | AGO | Crops | train | GCA_Sector | 470 |
Which subsector forms part of global climate change adaptation subsector in Agriculture Sector ? | Adapt Now subsector | Production of Iron and Steel Alloys. Forestry and Other Land Use. The inventory also contains information on forests, land use and land use change. In terms of classification, area and sampling data that represent various categories of land use are needed to estimate carbon stocks, the emission and removal of greenhouse gases associated with the activities in which the IPCC 2006 guidelines summarize how the Agriculture, Forestry and Other Land Use (AFOLU) sector. | Agriculture | Angola | {
"answer_start": [
21
],
"text": [
"land use and land"
]
} | First NDC | AGO | Crops | train | GCA_subsector | 471 |
Which Sector forms part of global climate change adaptation sector ? | Adapt Now sector (2) | Production of Iron and Steel Alloys. Forestry and Other Land Use. The inventory also contains information on forests, land use and land use change. In terms of classification, area and sampling data that represent various categories of land use are needed to estimate carbon stocks, the emission and removal of greenhouse gases associated with the activities in which the IPCC 2006 guidelines summarize how the Agriculture, Forestry and Other Land Use (AFOLU) sector. | Agriculture | Angola | {
"answer_start": [
21
],
"text": [
"land use and land"
]
} | First NDC | AGO | Crops | train | GCA_Sector_2 | 472 |
What are the Adaptation action/priority for the Agriculture Sector? | Action and priority | Scope and Coverage. Within the context of this NDC, Angola prioritizes the implementation of adaptation measures in the following main sectors:. Agriculture and Fisheries. Coastal Zone. Forest, Ecosystem and Biodiversity. Water resources. Human Health. Infra-structures. Agriculture and Fisheries. | Agriculture | Angola | {
"answer_start": [
25,
48
],
"text": [
"agriculture and fisheries. coastal",
"agriculture and fisheries"
]
} | First NDC | AGO | Fisheries and aquaculture | train | Adaptation action/priority | 473 |
Which Sector forms part of global climate change adaptation sector ? | Adapt Now sector | The fund is intended to be an instrument to boost agriculture, one of the priority sectors for the diversification of the national economy. The Government intends to develop the sector by promoting the local, regional and national economy and being a driving force for compliance with SDG 2: Eradicate hunger, achieve food security, improve nutrition and promote sustainable agriculture. | Agriculture | Angola | {
"answer_start": [
56
],
"text": [
"food security, improve nutrition and promote sustainable agriculture"
]
} | First NDC | AGO | Fisheries and aquaculture | train | GCA_Sector | 474 |
What are the Adaptation action/priority for the Agriculture Sector? | Action and priority | Implement a water collection and storage system in drought-prone areas to ensure continuity of human supply and watering of livestock. Increased frequency and intensity of periods of drought and water scarcity. 4,83. Human Health. | Agriculture | Angola | {
"answer_start": [
0,
30
],
"text": [
"implement a water collection and storage system in drought-prone areas",
"drought and water"
]
} | First NDC | AGO | Irrigation | train | Adaptation action/priority | 475 |
Which subsector forms part of global climate change adaptation subsector in Agriculture Sector ? | Adapt Now subsector | National Action Program to Combat Desertification; National Development Plan (PDN) 2018-2022;. Disaster Preparedness, Contingency, Response and Recovery Plan for the period 20142019;. Strategic Plan for Disaster Risk Prevention and Reduction;. Fisheries and Aquaculture Management Plan for the period 2018-2022. | Agriculture | Angola | {
"answer_start": [
34
],
"text": [
"plan for disaster"
]
} | First NDC | AGO | Irrigation | train | GCA_subsector | 476 |
Which Sector forms part of global climate change adaptation sector ? | Adapt Now sector (2) | The fund is intended to be an instrument to boost agriculture, one of the priority sectors for the diversification of the national economy. The Government intends to develop the sector by promoting the local, regional and national economy and being a driving force for compliance with SDG 2: Eradicate hunger, achieve food security, improve nutrition and promote sustainable agriculture. | Agriculture | Angola | {
"answer_start": [
56
],
"text": [
"food security, improve nutrition and promote sustainable agriculture"
]
} | First NDC | AGO | Irrigation | test | GCA_Sector_2 | 477 |
Which subsector forms part of global climate change adaptation subsector in Agriculture Sector ? | Adapt Now subsector (2) | Installation of small-scale solar panels (solar villages) – 187 MW. 258,25. 0,97%. 1 209. Installation of small-scale solar panels in the industry – 2 MW. 5,52. < 0,1%. 26. Installation of small-scale solar panels (NAMA Program) – 15. MW. 20,88. < 0,1%. 96,9. | Agriculture | Angola | {
"answer_start": [
2,
25,
47
],
"text": [
"small-scale",
"small-scale",
"small-scale"
]
} | First NDC | AGO | Irrigation | train | GCA_Subsector_2 | 478 |
What are the Adaptation action/priority for the Agriculture Sector? | Action and priority | Production of Iron and Steel Alloys. Forestry and Other Land Use. The inventory also contains information on forests, land use and land use change. In terms of classification, area and sampling data that represent various categories of land use are needed to estimate carbon stocks, the emission and removal of greenhouse gases associated with the activities in which the IPCC 2006 guidelines summarize how the Agriculture, Forestry and Other Land Use (AFOLU) sector. | Agriculture | Angola | {
"answer_start": [
21
],
"text": [
"land use and land"
]
} | First NDC | AGO | Land and soil management | val | Adaptation action/priority | 479 |
Which Sector forms part of global climate change adaptation sector ? | Adapt Now sector | The fund is intended to be an instrument to boost agriculture, one of the priority sectors for the diversification of the national economy. The Government intends to develop the sector by promoting the local, regional and national economy and being a driving force for compliance with SDG 2: Eradicate hunger, achieve food security, improve nutrition and promote sustainable agriculture. | Agriculture | Angola | {
"answer_start": [
56
],
"text": [
"food security, improve nutrition and promote sustainable agriculture"
]
} | First NDC | AGO | Land and soil management | train | GCA_Sector | 480 |
Which subsector forms part of global climate change adaptation subsector in Agriculture Sector ? | Adapt Now subsector | Installation of small-scale solar panels (solar villages) – 187 MW. 258,25. 0,97%. 1 209. Installation of small-scale solar panels in the industry – 2 MW. 5,52. < 0,1%. 26. Installation of small-scale solar panels (NAMA Program) – 15. MW. 20,88. < 0,1%. 96,9. | Agriculture | Angola | {
"answer_start": [
2,
25,
47
],
"text": [
"small-scale",
"small-scale",
"small-scale"
]
} | First NDC | AGO | Land and soil management | test | GCA_subsector | 481 |
What are the Adaptation action/priority for the Agriculture Sector? | Action and priority | Office for the Administration of the Cunene, Kubango and Cuvelai River Basins (GABHIC). Regulatory Institute for the Electricity and Water Sector. Ministry of Agriculture and Fisheries (MINAGRIP). National Directorate of Agriculture and Livestock. Department of Food Security. National Directorate of Forests. Agrarian Land Management Office. Agrarian Development Institute. | Agriculture | Angola | {
"answer_start": [
53
],
"text": [
"land management"
]
} | First NDC | AGO | Land and soil management | val | Adaptation action/priority | 482 |
Which Sector forms part of global climate change adaptation sector ? | Adapt Now sector | The fund is intended to be an instrument to boost agriculture, one of the priority sectors for the diversification of the national economy. The Government intends to develop the sector by promoting the local, regional and national economy and being a driving force for compliance with SDG 2: Eradicate hunger, achieve food security, improve nutrition and promote sustainable agriculture. | Agriculture | Angola | {
"answer_start": [
56
],
"text": [
"food security, improve nutrition and promote sustainable agriculture"
]
} | First NDC | AGO | Land and soil management | test | GCA_Sector | 483 |
Which subsector forms part of global climate change adaptation subsector in Agriculture Sector ? | Adapt Now subsector | Within the context of this NDC, Angola prioritizes the implementation of adaptation measures in the following main sectors:. Agriculture and Fisheries. Coastal Zone. Forest, Ecosystem and Biodiversity. Water resources. Human Health. Infra-structures. Agriculture and Fisheries. Climate change requires farmers to adapt to new agronomic practices such as conservation agriculture, growing of drought tolerant crops, precision agriculture (which in turn also requires a better access to input for seeds and fertilizers) and agro-forestry amongst others in order to improve productivity. | Agriculture | Angola | {
"answer_start": [
44
],
"text": [
"agriculture and fisheries. climate"
]
} | First NDC | AGO | Land and soil management | train | GCA_subsector | 484 |
What are the Adaptation action/priority for the Agriculture Sector? | Action and priority | waste management: waste collection, recycling, circular economy o health impacts of climate change. Strengthen the climate modelling capacity of agricultural production systems. Create early warning systems in order to support communities and reinforce contingency and emergency plans. | Agriculture | Angola | {
"answer_start": [
19
],
"text": [
"climate modelling capacity of agricultural production systems"
]
} | First NDC | AGO | Land and soil management | train | Adaptation action/priority | 485 |
Which Sector forms part of global climate change adaptation sector ? | Adapt Now sector | For the measures relating to renewable energy, biomass, mini hydro, and wind power, it was considered what was identified at ENAC, which is in line with what is stated in the Angola Energy 2025 strategy, corresponding to the installation of 800 mw of renewable energy by 2025, where 500 MW was considered for biomass, 100 MW for mini hydro and 100 MW for wind. In terms, of hydro and solar power potential projects were considered from projects that were already identified in the Renewable Energy Atlas of Angola. | Agriculture | Angola | {
"answer_start": [
93
],
"text": [
"renewable energy"
]
} | First NDC | AGO | Land and soil management | train | GCA_Sector | 486 |
Which subsector forms part of global climate change adaptation subsector in Agriculture Sector ? | Adapt Now subsector | In terms, of hydro and solar power potential projects were considered from projects that were already identified in the Renewable Energy Atlas of Angola. The hydroelectric capacity proposed to be installed in this scenario considers the Cambambe 2 project. The proposal for solar energy considers the Waku Kungo II and Lubango project. | Agriculture | Angola | {
"answer_start": [
45
],
"text": [
"solar energy"
]
} | First NDC | AGO | Land and soil management | train | GCA_subsector | 487 |
What are the Adaptation action/priority for the Agriculture Sector? | Action and priority | The fund is intended to be an instrument to boost agriculture, one of the priority sectors for the diversification of the national economy. The Government intends to develop the sector by promoting the local, regional and national economy and being a driving force for compliance with SDG 2: Eradicate hunger, achieve food security, improve nutrition and promote sustainable agriculture. | Agriculture | Angola | {
"answer_start": [
62
],
"text": [
"promote sustainable agriculture"
]
} | First NDC | AGO | Land and soil management | train | Adaptation action/priority | 488 |
Which Sector forms part of global climate change adaptation sector ? | Adapt Now sector | The fund is intended to be an instrument to boost agriculture, one of the priority sectors for the diversification of the national economy. The Government intends to develop the sector by promoting the local, regional and national economy and being a driving force for compliance with SDG 2: Eradicate hunger, achieve food security, improve nutrition and promote sustainable agriculture. | Agriculture | Angola | {
"answer_start": [
56
],
"text": [
"food security, improve nutrition and promote sustainable agriculture"
]
} | First NDC | AGO | Land and soil management | train | GCA_Sector | 489 |
Which subsector forms part of global climate change adaptation subsector in Agriculture Sector ? | Adapt Now subsector | Within the context of this NDC, Angola prioritizes the implementation of adaptation measures in the following main sectors:. Agriculture and Fisheries. Coastal Zone. Forest, Ecosystem and Biodiversity. Water resources. Human Health. Infra-structures. Agriculture and Fisheries. Climate change requires farmers to adapt to new agronomic practices such as conservation agriculture, growing of drought tolerant crops, precision agriculture (which in turn also requires a better access to input for seeds and fertilizers) and agro-forestry amongst others in order to improve productivity. | Agriculture | Angola | {
"answer_start": [
96
],
"text": [
"improve productivity"
]
} | First NDC | AGO | Land and soil management | train | GCA_subsector | 490 |
What are the Adaptation action/priority for the Coastal Zone Sector? | Action and priority | The adaptation component identifies measures for the period 2020-2025 in the following sectors: Agriculture and Fisheries; Coastal Zone Forests, Ecosystems and. Biodiversity; Water Resources; Human Health;. Infrastructures. | Coastal Zone | Angola | {
"answer_start": [
14
],
"text": [
"sectors: agriculture and fisheries; coastal zone forests, ecosystems"
]
} | First NDC | AGO | Coastal fisheries | train | Adaptation action/priority | 491 |
Which Sector forms part of global climate change adaptation sector ? | Adapt Now sector | The Government intends to develop the sector by promoting the local, regional and national economy and being a driving force for compliance with SDG 2: Eradicate hunger, achieve food security, improve nutrition and promote sustainable agriculture. Financing sources. Tax revenue associated with the import of agricultural products; State budget. | Coastal Zone | Angola | {
"answer_start": [
31
],
"text": [
"food security, improve nutrition"
]
} | First NDC | AGO | Coastal fisheries | val | GCA_Sector | 492 |
What are the Adaptation action/priority for the Coastal Zone Sector? | Action and priority | The adaptation component identifies measures for the period 2020-2025 in the following sectors: Agriculture and Fisheries; Coastal Zone Forests, Ecosystems and. Biodiversity; Water Resources; Human Health;. Infrastructures. | Coastal Zone | Angola | {
"answer_start": [
20
],
"text": [
"coastal zone forests, ecosystems"
]
} | First NDC | AGO | Coastal Zone: General | train | Adaptation action/priority | 493 |
Which Sector forms part of global climate change adaptation sector ? | Adapt Now sector | Recently, in 2019, Angola elaborated its Climate Change Adaptation Plan for the Coastal Zone, identifying the main vulnerabilities of this area to the impacts of climate change, as well as several adaptation measures to adapt the territory to those expected impacts. This plan is an outcome of the National Strategy for Climate Change, as it is one of the adaptation measures proposed for the Coastal Zone sector. | Coastal Zone | Angola | {
"answer_start": [
70
],
"text": [
"coastal zone"
]
} | First NDC | AGO | Coastal Zone: General | train | GCA_Sector | 494 |
Which subsector forms part of global climate change adaptation subsector in Coastal Zone Sector ? | Adapt Now subsector | Recently, in 2019, Angola elaborated its Climate Change Adaptation Plan for the Coastal Zone, identifying the main vulnerabilities of this area to the impacts of climate change, as well as several adaptation measures to adapt the territory to those expected impacts. This plan is an outcome of the National Strategy for Climate Change, as it is one of the adaptation measures proposed for the Coastal Zone sector. | Coastal Zone | Angola | {
"answer_start": [
8,
70
],
"text": [
"climate change adaptation plan for the coastal zone",
"coastal zone"
]
} | First NDC | AGO | Coastal Zone: General | test | GCA_subsector | 495 |
What are the Adaptation action/priority for the Coastal Zone Sector? | Action and priority | Recently, in 2019, Angola elaborated its Climate Change Adaptation Plan for the Coastal Zone, identifying the main vulnerabilities of this area to the impacts of climate change, as well as several adaptation measures to adapt the territory to those expected impacts. This plan is an outcome of the National Strategy for Climate Change, as it is one of the adaptation measures proposed for the Coastal Zone sector. | Coastal Zone | Angola | {
"answer_start": [
70
],
"text": [
"coastal zone"
]
} | First NDC | AGO | Coastal Zone: General | val | Adaptation action/priority | 496 |
Which subsector forms part of global climate change adaptation subsector in Coastal Zone Sector ? | Adapt Now subsector (2) | Prepare a recommendation opinion on climate policy documents developed by the. Ministerial Department responsible for the Environment for submission to UNFCCC;. Develop guidelines for planning and preparing NDC progress assessment reports;. Promote public discussion on climate change; Establish an NDC monitoring secretariat. Composition. | Coastal Zone | Angola | {
"answer_start": [
40
],
"text": [
"climate change"
]
} | First NDC | AGO | Coastal Zone: General | train | GCA_Subsector_2 | 497 |
What are the Adaptation action/priority for the Coastal Zone Sector? | Action and priority | Apply the national collection of local seeds in programs to improve and create adapted local varieties. Change / Loss of biodiversity. 7,50. Coastal Zone. Assess the defense capacity of existing protection structures in risk areas, including the analysis of the feasibility of new investments for the construction of protection structures against sea level rise. | Coastal Zone | Angola | {
"answer_start": [
53
],
"text": [
"protection structures against sea level"
]
} | First NDC | AGO | Sea-level rise protection | train | Adaptation action/priority | 498 |
What are the Adaptation action/priority for the Cross-Cutting Area Sector? | Action and priority | Disaster Preparedness, Contingency, Response and Recovery Plan for the period 20142019;. Strategic Plan for Disaster Risk Prevention and Reduction;. Fisheries and Aquaculture Management Plan for the period 2018-2022. Recently, in 2019, Angola elaborated its Climate Change Adaptation Plan for the Coastal Zone, identifying the main vulnerabilities of this area to the impacts of climate change, as well as several adaptation measures to adapt the territory to those expected impacts. | Cross-Cutting Area | Angola | {
"answer_start": [
25
],
"text": [
"fisheries and aquaculture management"
]
} | First NDC | AGO | Climate services | train | Adaptation action/priority | 499 |